A new implementation of Maximo was introduced to this leading Manufacturing Plant. As part of the project, full Systems Analysis was undertaken to ensure that the proposed System would cover all of their requirements. The project took a phased approach to introduce new features of Maximo.
Phase 1 was to introduce Work and Asset Management. This included Locations and Asset Hierarchies, Work Order Creation and Management, Preventative Maintenance Scheduling and Job Plans. Phase 2 introduced Inventory Control and Purchasing features.
As part of the Implementation, data was imported into Maximo using the Maximo Integration Framework. This included Asset, PM, Job Plan and Inventory Data. Full Training was provided to ensure that the Users were familiar with the System.